SRS: Case Studies
ATCS: Case Studies
Year of installation: 2014
Problem: Chemical use in cooling towers led to environmental and operational challenges.
Solution: 20 SRCT systems installed to condition water for two parabolic towers.
Results:
Year of installation: 2016
Problem: High water hardness and frequent scaling issues in cooling towers.
Solution: SRCT system installed in a new cooling tower.
Results:
Year of installation: ????
SRCT systems for water conditioning.
CQM prepared twenty interconnected systems in four containers. Each contained contains five systems, a control room, electrical connections and the water inlet and outlets.
+972-3-973-2080
HAZORFIM 12 LOD
info@cqm-tech.com